MPO╱ENGINEERING
HomePHARMA & LIFE SCIENCES

Pharmaceutical engineering and aseptic processes

Engineering for pharmaceutical systems: isolators, RABS, filling machines, washing machines and depyrogenation tunnels. Technical project support with EU GMP Annex 1 as a reference, alongside CFD and smoke studies.

01

EU GMP Annex 1

Technical assessment of project requirements for sterile medicinal product manufacturing, coordinated with the customer’s quality and validation teams.

02

Isolators and RABS

Engineering of barrier-system interfaces, material transfers, operator interventions and airflow, according to the process requirements.

03

Filling machines

Process engineering and integration of filling systems for vials, cartridges and syringes, considering upstream and downstream interfaces.

04

Washing machines and tunnels

Engineering integration of container washing and depyrogenation tunnels with the filling line, including layout, utilities and process interfaces.

CFD · DESIGN ENGINEERING

CFD studies from the design stage

Computational fluid dynamics (CFD) simulates fluid flow, such as air, and can include heat transfer. In laboratories, cleanrooms, isolators and RABS, it helps assess airflow around equipment and critical areas.

When to apply CFD

For projects requiring airflow assessment, CFD studies should begin during concept and layout development, before design approval, fabrication and installation. This allows alternatives to be compared while changes are still easier to incorporate.

01

Anticipate flow issues

Identify predicted recirculation, low-velocity regions and flow disturbances around equipment.

02

Compare design alternatives

Evaluate equipment positions, supply and return locations, and operating conditions before selecting the solution.

03

Reduce late changes

Support early design decisions and help reduce rework, prototype iterations and changes during installation.

04

Guide physical studies

Use the findings to plan observation points and scenarios for subsequent airflow visualization studies.

From model to installation

Define the geometry and operating conditions; check mesh sensitivity and convergence; compare scenarios; document assumptions, limitations and recommendations; then compare predictions with physical measurements where applicable. CFD complements smoke studies and qualification of the installed system.

CFD & SMOKE STUDIES

Airflow visualization

Computational fluid dynamics and physical airflow visualization support technical analysis of laboratories, cleanrooms and barrier systems.

01

Study planning

Defining objectives, observation points, test conditions and interventions to assess, according to the process and environment.

02

Airflow visualization

Smoke studies to observe airflow paths, possible recirculation, stagnant zones and disturbances caused by equipment, materials and operator movements.

03

At-rest and operating conditions

Assessment of relevant project conditions, including simulated activities and planned interventions, according to an agreed protocol.

04

Records and technical analysis

Video documentation of assessed scenarios, organization of evidence and a report with observations and recommendations for discussion with the responsible team.

TECHNICAL EXPERIENCE

Processes, facilities and industrial systems

01

Solid products and APIs

Knowledge of solid-product processes and active pharmaceutical ingredients (APIs), considering material flows, equipment interfaces, containment needs and cleaning requirements during project definition.

02

Water systems and process utilities

Knowledge of water systems and their integration with production: use requirements, generation, storage, distribution and points of use. Technical coordination between process, utilities, equipment and quality teams.

03

Cleanrooms and laboratory setup

Knowledge of controlled environments, personnel and material flows, layout and interfaces with air-handling systems. CFD during design and physical airflow studies support project decisions.

04

Process engineering

Process requirements, capacity, layouts, equipment interfaces and utilities. Integration of filling, washing, tunnels and barrier systems with operational needs.

05

ISO and engineering documentation

Knowledge of ISO-related procedures, document control, standardization and traceability. Professional experience implementing ISO 9001 procedures within an engineering department.

06

Projects, automation and SAP

Scope, schedules, risks, procurement and multidisciplinary coordination, with requirements definition for interfaces between industrial processes, automation and SAP.

LET’S TALK

Engineering support
for your next project.

Talk to MPO ↗